 With the canal secure, a number of initiatives were taken at Wallbridge. 
The first major step was the restoration of Wallbridge Upper Lock itself by
the Stroud Valleys Project. This started in 1990 and a new set of lower gates
were fitted which reused recycled timber from a set of old emergency stop
gates from the Gloucester and Sharpness Canal  which had just been replaced 
by BW. Unfortunately insufficient heavy timber work was used, and once dried 
out, the recycled timber tended to split rendering these gates unusable. The
top gates were eventually finished off and installed by the Canal Trust.
 With the canal secure, a number of initiatives were taken at Wallbridge. 
The first major step was the restoration of Wallbridge Upper Lock itself by
the Stroud Valleys Project. This started in 1990 and a new set of lower gates
were fitted which reused recycled timber from a set of old emergency stop
gates from the Gloucester and Sharpness Canal  which had just been replaced 
by BW. Unfortunately insufficient heavy timber work was used, and once dried 
out, the recycled timber tended to split rendering these gates unusable. The
top gates were eventually finished off and installed by the Canal Trust. 